A 136-meter Concrete Bridge crossing Bungcalalan River will be constructed soon in Barangay Baikingon, Cagayan de Oro City as part of the Pueblo de Oro – Laguindingan Mountain Diversion Road Project. More specifically, the bridge project is right in the vicinity of MJN Farm and Cafe. Total project cost is P110.92675 million with duration of 360 calendar days.


Here’s a more detailed map showing the location of the project. The green section is already done.

Below are the engineering layouts.



Keep posted.

