Check out the latest progress update on the construction of the new Bukidnon Airport located in Maray-maray, Don Carlos, Bukidnon. Phase 3 construction is still ongoing which includes the passenger terminal building, runway strip, runway extension and runway markings. Phase 3 contractor is Tokwing Construction Corp./Mamsar Construction and Industrial Corp. joint venture. Aerial survey courtesy of Project LUPAD.
Watch below.
LOCATION – the airport project is located in an old airstrip in Maray-Maray, Don Carlos, Bukidnon, some 7-8 kilometers west of the town proper.










Here are screengrabs.
RUNWAY EXTENSION





TERMINAL – foundation works (pile driving) still ongoing




LANDSCAPING – the open spaces still need greenery





Here’s the terminal with respect to the runway.

Meanwhile, the Civil Aviation Authority of the Philippines (CAAP) recently sent out an Invitation to Bid for Php 970,316,802.34 for Site Preparation of Landside Area, Construction of Access Road & Vehicular Parking Area (VPA), VPA Lighting, Exterior Power Distribution, Exterior Drainage System, Exterior Water Distribution, Landscaping at Landside Area, Extension & Widening of Runway, Provision of Slope Protection, Construction of 9-Storey Control Tower Building, 2-Storey Admin, Building, Communal Toilet, Waiting Area A & B, Ticketing Booth A (+Units) & B (2-Units), 10,000 Gallons Steel Water Tank A & B, Pumphouse A, B & C, Powerhouse, Transformer Yard (2-Units), CSIS Oflice Building, Cargo Terminal Building, Rescue & Fire Fighting Facility, STP Control Room, Cuardhouse A & B, Covered Pathway 13-Units Lifting Station with 26 Service Manhole, Water Impounding System & Staff House Building.

Keep posted.