Opol’s coastal front is set for a major upgrade as Phase 2 of the Opol Boardwalk Project, covering an 8,000-square-meter area, is expected to begin soon, with all required government permits secured and PEZA engineers set to arrive this week to start initial operations. Designed as a vibrant waterfront destination for residents and visitors, the ₱100-million expansion will feature a boardwalk, wide promenade, landscaped green spaces, picnic areas, interactive dancing water fountains, and an outdoor amphitheater with a performance stage beneath modern tensile fabric structures, along with covered walkways, expanded parking, and designated spaces for future seaside café and dining establishment.

Below is the site development plan.

screengrabs from SOMA of Mayor Jay Bago


Leave a Reply

Discover more from PROGRESS WATCH: Metro Cagayan de Oro and Northern Mindanao

Subscribe now to keep reading and get access to the full archive.

Continue reading