There’s not much progress of the Bonbon-Macabalan Bridge Project in Cagayan de Oro City as of May 2023. It can be recalled that instead of going straight towards Port Area, the bridge makes a turn towards the viaduct section and connects to the Punta Section of the Coastal Road. To date, construction is still focused on the Macabalan portion of the Coastal Road link.

Here’s the latest aerial video by NorMin etc.

Here’s the latest layout of the Macabalan-Bonbon Bridge Project in Cagayan de Oro City showing the viaduct section and bridge continuation connecting to the Coastal Road.

Read our previous post below.

Screengrabs below.

Keep posted.


Leave a Reply

%d