Motorists are wondering when will DPWH resume the drainage project which has now crossed the Bulua Highway-Westbound Terminal Junction, one of Cagayan de Oro’s main intersections leaving only a single lane passable tor vehicles passing the area. Except for the signages, no workers have been observed onsite since the holidays. Traffic worsens at the intersection during rush hour.
The drainage project connects the main drainage aling Bulua Highway to Saarenas Avenue towards Westbound Terminal before draining to the bay.






