The proposed 64.7-kilometer Central Mindanao High Standard Highway (Cagayan de Oro–Malaybalay Section) will include a toll plaza and five major interchanges—features that will be a first in Northern Mindanao. According to the DPWH Preparatory Survey Final Report, these interchanges will link the new highway to the existing Sayre Highway. The total project cost is estimated at P144.85 billion, with Section 1 proposed to be funded by the Japan International Cooperation Agency (JICA) and Sections 2 to 5 proposed to be financed by the Asian Development Bank (ADB).

1. CDO Toll Plaza

This toll plaza in Cagayan de Oro is actually in Tagoloan area (Casinglot) and is connected with Butuan-CDO- Iligan Road. The intersection needs to be modified to improved entry and exit to the road.

The intersection will be improved as shown below. The existing number of lanes is six lanes at this section of the Iligan-CDO-Butuan Road.

2. Mambatangan Interchange

This interchange is intended to provide access to some urban area along Sayre Highway, an alternative route to avoid an accident-prone area at existing zigzag section at Puerto.

3. Manolo Fortich Interchange

This interchange is intended to provide access to Manolo Fortich. The center of Manolo Fortich is located on the north side of this interchange. It is assumed that traffic in Manalo Fortich will use this interchange.

4. Impasug-ong Interchange

This interchange provides access to Sayre Highway. Impasug-ong and Sumilao residents will use this interchange.

5. Dalwangan Interchange

This interchange provides access to Sayre Highway at Dalwangan in Malaybalay City. Dalwangan residents will use this interchange.

6. Malaybalay Interchange

This interchange provides access to/from Sayre Highway at Malaybalay.

Interchange Access Road

Mambatangan Interchange Access Road

Manolo Fortich Interchange Access Road

Impasug-ong Interchange Access Road

Dalwangan Interchange Access Road

Malaybalay Interchange Access Road

Proposed Rest Areas

At Sta 34+ 000, a proposed overpass farm crossing structure and an adjacent location of the HSH rest area is shown.

A possible rest area layout to be considered is shown below.

The total project cost is estimated at P144.85 billion, with Section 1 proposed to be funded by the Japan International Cooperation Agency (JICA) and Sections 2 to 5 proposed to be financed by the Asian Development Bank (ADB).

Related post below.

maps, data from DPWH Preparatory Survey for Central Mindanao High Standard Highway Project (Cagayan de Oro-Malaybalay section) Final Report (Advanced Version)