The 3.17-km Panguil Bay Bridge is currently undergoing a waterproofing application, a crucial step to ensure its longevity by protecting the road surface from potential water damage. This process is essential to safeguard the bridge’s structural integrity, preventing water infiltration that can lead to deterioration over time. The soon to be the longest bridge in Mindanao includes a 320-meter extra-dosed main bridge, a 1,920-meter pre-stressed concrete girder approach bridge, and a 929-meter approach road. Meanwhile, the bridge’s opening could be reset based on the progress of the approaches on both sides which are still far from completion. Screengrabs from Engineer’s Gaming video.

Here are the approaches on both sides. The August 15 opening might not yet be attained. See below.

Watch the full video below by Engineer’s TV Channel.


Leave a Reply

Discover more from PROGRESS WATCH: Metro Cagayan de Oro and Northern Mindanao

Subscribe now to keep reading and get access to the full archive.

Continue reading